Information about the project

Project status

Completed project

Category

Energy and industrial engineering

Title object

Chornobyl NPP

Shape attend

General contractor

Customer

SSE «Chornobyl NPP»

Terms of works

August 2016 - November 2016

Installation of electric heating units at Chornobyl NPP facilties

The project provides execution of works for installation and connection of electric heating units at 13 facilities of SSE CNPP.

The project provides:

  1. development of engineering design documentation;
  2. equipment batching;
  3. fabrication of modular electric heating units;
  4. installation of modular units and their integration into heating system;
  5. execution of individual tests of the equipment;
  6. execution of integrated testing of building heating systems.

Implementation of the project enabled standalone heating of 13 facilities during winter period without capacities of gas-operating production boiler plant.